Top issues

Top Five Issues:
1. Cleanliness trains inside and outside, tracks, railway stations
2.Punctuality
3. Modernisation of coaches, engines and increasing the speed
4. More inter city trains with high speed
5. User friendly online reservation system more  

View all 27 comments Below 27 comments
Dear sir. railways delopment one bye one clear. But still kerala people waiting.eg.bangalore to kerala intercity train so many times no water and compartment very old.no body bother. more  
Railway Minister in his speech said out of 300 projects proposed from time to time only one project was implemented. This clearly shows that there is no reviewing mechanism existed. people at all levels were not giving picture even to their own superiors. too much to expect right information to the media and general public. How we can expect growth .i am happy At least this got exposed. more  
IN MY OPINION TOP ISSUE IS SAFE RUNNING OF TRAIN AT A DESIRED SPEED TO REACH DESTINATION ON TIME. MAJOR HURDLE TO ACHIEVE THIS ARE TROUBLE IN LOCO,COACHES , WAGONS, RAILWAY TRACK, SIGNALING, ACCIDENT. MAIN REASON FOR THE ABOVE ARE POOR MAINTENANCE IN ALL SPHERE OF RAILWAYS. IN LAST FEW YEARS IN THE NAME OF ABOVE ONLY NEW ZONES OF RAILWAYS WERE CREATED TO ACCOMMODATE OR PROMOTE TOP OFFICIALS. i.e.  TOP HEAVY ADMINISTRATION, WITHOUT DIRECTLY IMPROVING THE EFFICIENCY OF RAILWAY OPERATION. THESE SHOULD BE REVIEWED, AND BOTTOM LEVEL WORKER & SUPERVISOR'S RATIO SHOULD BE REVIEWED. STRUCURE SHOULD BE TRULY PYRAMID. AND IN THE NAME OF COST REDUCTION NO OF LOWER LEVEL MAINTENANCE STAFF WAS REDUCED OR OUTSOURCED. I AM NOT AGAINST OUTSOURCING BUT  ACCOUNTABILITY OF PROPER SUPERVISION AND CERTIFICATION, FIXING OF PARTY'S ARE IMPORTANT. WHICH ARE NOT BEING DONE PROPERLY RESULTING POOR PERFORMANCE OF OUTSOURCE ACTIVITY AND LOOTING OF RAILWAYS MONEY AND GENERATING MAFIA'S IN THIS FIELD WITH LOCAL POLITICAL PROTECTION. IN MY OPINION TOP PRIORITY AND ALLOCATION OF FUND SHOULD BE GIVEN TO MAINTAIN ROLLING STOCK,TRACK INCREASE THE MAINTENANCE TIME OF ROLLING STOCK. REPLACEMENT OR ADDITION OF ROLLING STOCK. ALL THESE ARE MORE IMPORTANT THAN ANNOUNCING INCREASE OF RAILWAY SPEED OF PASSENGER TRAIN. IN MY OPINION RAILWAY SHOULD THINK OVERALL INCREASE OF GOODS TRAIN SPEED SO THAT TRACK CAN CATER MORE TRAIN IN AS GIVEN TIME. ALL PASSENGER TRAIN STOPPAGE INCREASED DUE TO POLITICAL PRESSURE SO BE REVIEWED IMPARTIALLY. FURTHER ECONOMY OF ALL RUNNING RAILWAY PROJECT ALSO SHOULD BE REVIEWED, ONLY THEN INDIA CAN MAKE THEY RAILWAY IN RIGHT TRACK. YOURS DEBENDRA NATH SINHA On Friday, 18 July 2014 11:58 AM, WILLIAM VARGHESE wrote: more  
WHEN I DRIVE MY CAR USING AIR CONDITIONER, IT IS MORE RELAXED AND I CAN'T FEEL SLEEY EVEN AFTER 500 KM DRIVING, BUT WHEN DRIVE WITHOU AC I TIRED MUCH EARLY. WITH AC DRIVER BECOMES MORE COMFORTABLE AND HIS MIND WILL BE MORE ALERT more  
Railways, instead of implimenting basic facilities, as pointed out by William Varghese, it is interested in having bullet trains. These bullet trains need upgradation of track, rolling stock, signelling and special training to railway staff. It will cost additional expenditure of Rs.125 crores per km. With this cost, railway can build additional 25 km railway line, for expenditure to be incurred in upgradation of 1 km of existing railway line. Moreover, hardly one or two bullet trains per day will run on such line. What is the use? Instead, just by incerasing the speed of existing trains, Railways will get more rolling stocks, and more trains can be run. Our tracks are capable of running the trains at a speed of 160 km per hour. Our rolling stocks are capable of running at 120 km per hour. In our country, heighest speed train, Rajdhani Express running at a speed of 85 to 95 km per hour. Superfast trains are running at an average speed of 50 to 60 km per hour. Then why not to increase the speed of existing trains as: Passenger Trains (stopping at all stations) will run at 60 to 70 km. per hour. Mail and Express Trains will run at 70 to 90 km per hour. Superfast trains will run at 90 to 110 Km per hour. Rajdhani Express, Garib Rath and such other high speed trains will run at 110 to 120 Km per hour. I hope Railway Minister will take this suggestion in to consideration, and will impliment it soon. Shirish S. Shanbhag, Mumbai-400089. Dated: 20.7.2014 Email ID: s.s1954@rediffmail.com more  
Post a Comment

Related Posts

    • Trains now completely ruined

      Trains are completely ruined. 2AC also not spared. People forcing themselves in, fighting with confirmed ticket holders to share their seats, Horrible. Where is the Railways Minister. LC...

      By SN Mittal
      /
    • REFUND RULES

      WHY NO REFUND CAN BE CLAIMED FOR MISSED TRAIN , WE CANNOT FILE TDR OR CLAIM ANY REFUND IF WE MISS A TRAIN FOR ANY REASON AS RULE SAYS TO FILE BEFORE 24 HOURS , OR EVEN FOR DELAYED TRAIN FOR MORE TH...

      By Sona Shah
      /
    • रेलवेज़ हमे लूट रही

      क्या आप जानते हैं कि, अगर आपने IRCTC के वेबसाईट से वेटिंग टिकट बुक किया और वो कंफर्म नहीं हुआ तो खुद रेलवे खुद उस टिकट को कैंसिल कर देती है एवं आप द्वारा भुगतान किए गये राशि का एक बड़ा हिस्सा ...

      By Ajay Kumar
      /
    • No direct trains

      There are some business centers,even now, which are not connected by direct trains. MORADABAD , known as PEETAL CITY, a big business center, in western Uttar Pradesh, is not having even direct...

      By Satyapal Singh
      /
    • Newly introduced trains boast a pristine appearance, offering posh interiors, comfortable seating,

      , and swift travel. However, the inadequacy of trains during festive and holiday periods remains a pressing issue. Among those most affected are the guest workers, migrant laborers traveling long d...

      By Jayakumar Daniel
      /
    • Railways making bomb from cancellation

      Railways earned whopping ₹1,230 crore from cancelled waiting list tickets in last 3 years. And all from this circle are quiet about it. Are we all ok with this?

      By Shailesh Deshmukh
      /
    • Food in Rajdhani express

      Why is the standard of food onboard the Rajdhani express' so bad. I and wife often travel on the Delhi-Dibrugarh Rajdhani and each time our experience has been bad. What is being with so much of mo...

      By Ajay Kumar
      /
    • Trains running 12-21 hours late

      Is this some kind of a joke on train travellers. Why would I travel in Vande Bharat if it is 12.5 hours late. Is it not equipped to run in fog? Does it not have antifog mechanisms?? Answ...

      By Ajay Dutta
      /
    • ILLEGAL BUSINESSES IN RUNNING TRAINS. RAILWAY BOARD BE SERIOUS.

      The zonal railways NOT monitoring the railway services. Railway Board must take serious action on passenger complaints. Ignorant attitude of Senior Railway officials only encouraging such illegal ...

      By KISHANU DAS
      /
    • An incident recorded by fellow passenger on his mobile may be looked into to prevent such incidents.

      This video clip says how the railway pantry car giving services and distributing food and water in an AC Coach of a train. Is Railways serious to prevent such things and ensure food safety in train...

      By Sandip Mishra
      /
    • Railway crowds

      Railways are run as an industry, and profits are important. If it is meant for 80 percent people traveling in unreserved coaches, 80 percent of the coaches need to be unreserved. Fares also should ...

      By Narayanankutty K.A
      /
Share
Enter your email and mobile number and we will send you the instructions

Note - The email can sometime gets delivered to the spam folder, so the instruction will be send to your mobile as well

All My Circles
Invite to
(Maximum 500 email ids allowed.)